Location: Healdsburg, CA

Contractor: Steve Martin Associates

Trades: Mechanical, Plumbing, Underground Utilities

Contract Value: $1.1  million


 

Mark III delivered this project for a brand new winery in Healdsburg, CA. The project included a 21,765 SF building to host a 35,000 gallon wine production area with an attatched 2,380 SF canopy and a detached mechanical building. Due to the nature of the existing space, the sitework improvements included all grading, drainage, and erosion control measures. Our team installed a glycol chiller, an air compressor system, DDC controls for temperature control of the entire facility, a VRF-HVAC system, hydronic pumps, and valves to the tanks. This project was fully modeled, detailed, and fabricated by Mark III.